Skip to content
RedAssayDocs
Browse the docs

Using RedAssay / Audits

Audit documents

Three documents an auditor expects you to write yourself: the Statement of Applicability, the SOC 2 system description and a PCI DSS working paper. What is pre-filled, what is left to you, and how approval works.

On this page
  1. What these documents are
  2. Statement of Applicability
  3. SOC 2 system description
  4. PCI DSS working paper
  5. Versions and approval

What these documents are

Audits, Documents holds three kinds of document. Each one is yours: RedAssay drafts it from the data you already keep, you edit it and decide every entry, and someone in your organization approves it. Nothing here is approved, audited or issued by RedAssay.

DocumentForExports
Statement of ApplicabilityISO/IEC 27001:2022, ISO/IEC 42001:2023, ISO/IEC 27701:2019PDF, CSV
System descriptionSOC 2PDF, Markdown
PCI DSS v4.0.1 working paperPCI DSSPDF, CSV

Owners and admins start, edit and approve documents. Auditors can read and export them. A document can be tied to one engagement; the audit package includes the approved documents tied to that engagement and those tied to none.

Statement of Applicability

One entry per Annex control of the chosen standard. For each, RedAssay suggests whether it applies and how far it is implemented, from the controls you have mapped to it and the risks linked to them. A suggestion is not a decision: every entry has to be confirmed by a person.

Before it can be approved, every entry needs a decision on whether the control applies. An included control needs at least one reason for including it and an implementation status; an excluded one needs a justification of at least 20 characters. An entry that still holds suggested values has to be confirmed.

This Statement of Applicability is the organisation's own document. RedAssay pre-fills a draft from the control data the organisation keeps in it; the organisation decides each entry and approves the text. RedAssay does not approve, audit or certify it.

SOC 2 system description

A SOC 2 report contains management's description of the system. Management writes and owns it; the auditor evaluates it. The draft lays out the sections a description needs, with guidance on what belongs in each, in RedAssay's own wording.

Only what RedAssay's records show is pre-filled: the categories in scope (from the SOC 2 frameworks you adopted), the period (from the engagement it is tied to), your subprocessors as subservice organisations, a matrix of your controls, and the facts it holds for a section (from the company profile, connected integrations and published policies). Everything that has to come from the company is left as a prompt marked [TO COMPLETE: …].

It cannot be approved while a section is empty or still has a marked prompt, or while a subservice organisation has no name or no choice between carve-out and inclusive. Refresh updates the generated parts and adds newly flagged subprocessors; it never rewrites your text.

The auditor's report will include management's description of the system and management's assertion about it. Management owns both. This draft helps write the description: RedAssay pre-filled what its records show and left prompts for the rest. It is not an auditor's opinion and not a SOC 2 report.

PCI DSS working paper

Two parts: a short scoping questionnaire (merchant or service provider, how you accept cards, whether account data is stored electronically) that points at the self-assessment questionnaire type that typically applies, and a response sheet over the PCI DSS requirements in the library, with a suggested response from your mapped controls.

Before approval, the scoping questions must be answered and every requirement needs a confirmed response; responses that need an explanation need one of at least 20 characters. The requirement titles and summaries are RedAssay's own wording, not PCI SSC's text.

Versions and approval

A document starts as version 1 in draft. Approving a version freezes it and stamps a SHA-256 of its content, which is printed on the PDF. A later change is a new version, drafted from the last one with its generated parts refreshed; approving it marks the earlier one superseded. There is one draft at a time.

  • A version can be approved only when nothing on it needs attention. The editor lists what does.
  • The person who edited a version cannot approve it while another owner or admin exists. In an organization with a single owner or admin, they can, and the version is marked as self-approved. This is the same rule as for policies.
  • A draft that was never approved can be discarded. Once a version has been approved, the document is a record and stays. A draft version started on top of an approved one can be discarded by an owner or admin with Discard this draft: the approved and superseded versions are untouched, the discard is written to the activity log, and the next draft takes the same version number.
  • An export is written to the activity log. A draft's export is labelled as a draft, and the note printed on a Statement of Applicability says the version has not been approved; on an approved version it says who approved it and when.